After a call from Richard Dean - Ginetta's Managing Director at 6.30 last night. I loaded the car up and headed to the Ginetta Factory.
I'm going to try and get it ready for knockhill! a big project!
I was on my own today so progress was a bit slow. The Ginetta mechanics had to update 11 G50's during the day with some extra poles in the chassis so they were extremely busy.
Still by 8pm the car looked like this:
And this:
Damage so far:
Engine has a hole in the bottom and in the side
Alternator melted
starter motor looking a bit singed
Main wiring loom fried
Melted gearbox sensors, boots and cables
Rear diffuser melted bt repairable
some heat damage to paint on rear bumpers
car covered in extinguisher powder residue
Since taking the pics I've cleaned up the engine bay. I left at 11pm.
Tomorrow - it goes back together plus I have Kenny and Jonny to help.